建筑桩间竖直埋管地源热泵中央空调工程
左明耀张新发
(天津中冷暖通洁净工程技术有限公司天津300131)
摘要:通过工程实例介绍了在建筑桩间或重型道路下铺设竖直地埋管换热器的设计与施工特点,提出了在进行水力计算和强度计算的基础上还要进行管道的管壁截面环向稳定性校核计算和最大竖向变形校核计算及其方法,提出了桩与竖直地埋管换热器合理间距的计算方法。
关键词:桩间竖直地埋管换热器;合理间距;环向稳定计算;竖向变形计算;回填。
Vertical closed-loop ground source heat pump central air-conditioning project between construction’s pile
Zuo Mingyao Zhang Xinfa
(Tianjin Zhongleng Heating Ventilation and Cleaning Project Technique Co. , Ltd. Tianjin 300131)
Abstract Through the project example we introduce the design and the construction characteristic laying down vertical closed-loop the heat interchanger between the construction pile or under the accepting heavy pat,In foundation carrying on the hydraulic pressure computation and in the strength calculation foundation , Propose the examination computation and its the method with the pipeline the pipe wall section different stability and the most greatly vertical distortion, also propose the computational method ofreasonable spacing between the pile and vertical closed-loopthe heat interchanger.
Key words Vertical closed-loopheat interchanger between pile;Reasonable spacing; Link to stable computation; Vertical distortion computation; Backfill.